Weetwood Primary School, Leeds

At Weetwood Primary School in Leeds, the Maple Leaf Designs team updated the Foundation Stage Area, Main Playground and After School Club Area.

In the Foundation Stage Area, the existing Play Tower was removed and replaced with a Bespoke Jumbo Wildwood Play Tower featuring a Traverse Trail and Stairs. The area was then resurfaced with 10.8m² of new Earth Brown Safamulch for a refreshed and reliable play environment.

In the Main Playground, a 5-Way Basketball Shoot and an Octopus 4-Way Ball Catcher were installed within the court markings.

For the After School Club, an additional access area was created. The fencing was adjusted to include a new access gate, and 22 linear meters of 1m high Timber Bow Top Fencing was installed to enclose the space. Within this new area, an Octagon Agility Set was added, featuring Hanging Logs, Parallel Rope, Traverse Net Low, Hanging Ropes, Balance Beams, and Traverse Poles. To complete the project, 83m² of Earth Brown Safamulch Safety Surfacing was laid to ensure a soft and durable play surface.

Kickstart your playground redevelopment project today and contact Maple Leaf Designs – call us on 01270 253214, or send an email to enquiries@mapleleafdesigns.co.uk